Case Studies

Gold Coast University Hospital

 
Product Used: Thermotec NuWrap 5™
Specifying Consultant: TSKM Brisbane
Main Contractor: Lend Lease
Mechanical Services: Hastie Group
Description: The $1.76B Gold Coast University Hospital is the largest ever public health infrastructure project to be built in Australia. This is a new 750 bed facility which will provide new and expanded health services to the region. Thermotec NuWrap 5™ Acoustic Pipe Insulation was specified and used on all waste services and associated pipework where noise reduction was required. Thermotec NuWrap 5™ meets BCA requirements and was independently approved by SKM prior to the specification being released.

Orange Base Hospital

 
Product Used: Thermotec NuWrap 5™ Acoustic pipe insulationThermotec 4-Zero thermal pipe insulation
Specifying Consultant: JHA Consulting
Main Contractor: Hansen Yuncken
Mechanical Services: Ajax Plumbing
Description: The new Orange Base Hospital is a $250m project which will accommodate 197 acute inpatients at most. The project also includes mental health bed-based services for 157 clients including secure mental health patients. Thermotec 4-Zero thermal pipe insulation and NuWrap 5™ acoustic pipe insulation were both specified and used on this project.