Projects

Mackay Base Hospital

 
Product Used: Thermotec NuWrap 5™ Acoustic pipe insulation
Thermotec 4-Zero thermal pipe insulation
Main Architect: Woods Bagot / Billard Leece Partnership
Hydraulic Consultant: Norman Disney Young
Main Contractor: Baulderstone Queensland
Mechanical Services: Christopher Contracting
Cost of Project: $408M
 

Description:The project was a three stage development which proposed a new acute hospital, rebuilding of the Main Entrance building as well as a light refurbishment of the Women’s and Children’s, Dental and Allied Health buildings. The aim was to create a patient-focused health system that encourages innovative models of care. The final stage is expected to be complete by the end of 2013. Both Thermotec 4-Zero thermal pipe insulation and NuWrap 5™ acoustic pipe insulation were both specified and used on this project.

Liverpool Hospital

 
Product Used: Thermotec NuWrap 5™ Acoustic pipe insulation
Thermotec 4-Zero thermal pipe insulation
Main Architect: Rice Daubney
Hydraulic Consultant: Sinclair Knight Mertz / Whipps Wood
Mechanical Services: Boone & Willard & John R Keith
Cost of Project: $408M
 

Description: The project was a complex redevelopment comprising new build and refurbishment. The new Clinical Services Building is 45,000 square metres, seven storeys high and includes Basement area and Heliport facilities. The existing Cancer Centre was refurbished and extended. Both Thermotec 4-Zero thermal pipe insulation and NuWrap 5 acoustic pipe insulation were both specified and used on this project.

Gold Coast University Hospital

 
Product Used: Thermotec NuWrap 5™
Specifying Consultant: TSKM Brisbane
Main Contractor: Lend Lease
Mechanical Services: Hastie Group
 

Description: The $1.76B Gold Coast University Hospital is the largest ever public health infrastructure project to be built in Australia. This is a new 750 bed facility which will provide new and expanded health services to the region. Thermotec NuWrap 5™ Acoustic Pipe Insulation was specified and used on all waste services and associated pipework where noise reduction was required. Thermotec NuWrap 5™ meets BCA requirements and was independently approved by SKM prior to the specification being released.

Orange Base Hospital

 
Product Used: Thermotec NuWrap 5™ Acoustic pipe insulationThermotec 4-Zero thermal pipe insulation
Specifying Consultant: JHA Consulting
Main Contractor: Hansen Yuncken
Mechanical Services: Ajax Plumbing
 

Description: The new Orange Base Hospital is a $250m project which will accommodate 197 acute inpatients at most. The project also includes mental health bed-based services for 157 clients including secure mental health patients. Thermotec 4-Zero thermal pipe insulation and NuWrap 5™ acoustic pipe insulation were both specified and used on this project.