Our Projects
St George Hospital Redevelopment - Stage 3
Location:
Sydney, KogarahThermotec’s Contribution to the $411 Million St George Hospital Redevelopment
Thermotec is proud to be a part of the $411 million St George Hospital Redevelopment – Stage 3, an ambitious project that will transform healthcare services for the local community. Known as The Kensington Street Building, this state-of-the-art facility is set to enhance accessibility and deliver exceptional care for patients and their carers, particularly for those with chronic conditions or mobility challenges.
The project also includes the demolition of outdated infrastructure, refurbishment of existing services, and landscaping of the hospital forecourt. Completion is slated for late 2026, delivering a cutting-edge healthcare hub designed to meet the long-term needs of the community.
Thermotec NuWrap 5: Supporting Advanced Healthcare Infrastructure
A critical element of this redevelopment is ensuring that the hospital’s facilities meet stringent acoustic and thermal performance standards to create a safe, comfortable environment for patients, staff, and visitors. Thermotec’s NuWrap 5 acoustic pipe lagging plays a vital role in achieving these outcomes.
NuWrap 5, with its hybrid composite design, combines mass-loaded vinyl (MLV), convoluted acoustic foam, and a fire-resistant aluminium foil facing. This innovative solution was chosen for its unmatched performance in:
Reducing noise transmission: Essential in hospital environments, where quiet spaces are critical for patient recovery and staff efficiency.
Enhancing fire safety: The fire-resistant aluminium foil facing provides additional protection, a key consideration for healthcare facilities.
Improving durability and flexibility: NuWrap 5 is easy to install around complex pipe systems, ensuring efficient operation and long-term reliability.
Creating a Quieter, More Efficient Hospital Environment
In large-scale healthcare facilities like The Kensington Street Building, managing noise is critical to creating a healing environment. NuWrap 5 is being used extensively in the redevelopment to lag waste pipes, ductwork, and other acoustic-sensitive areas. By controlling airborne and structure-borne noise, Thermotec’s NuWrap 5 ensures:
- Quieter patient rooms: Promoting rest and recovery by minimizing disruptive noise from plumbing and HVAC systems.
- Improved staff focus: Reducing noise levels in operational areas supports better concentration and efficiency.
- Compliance with Australian standards: NuWrap 5 meets stringent building codes for acoustic and fire safety in healthcare environments.
Thermotec is honoured to contribute to the St George Hospital Redevelopment, a project that will provide first-class healthcare facilities for generations to come. This collaboration reflects our commitment to delivering innovative insulation solutions that enhance infrastructure, improve quality of life, and support critical community services.
The completion of this project in late 2026 will mark a significant milestone in healthcare infrastructure, ensuring the hospital remains a cornerstone of care for the community. Thermotec is proud to play a part in this legacy with NuWrap 5, a product that embodies our dedication to innovation, quality, and sustainability.
For more information about NuWrap 5 and other acoustic and thermal insulation solutions, contact our team today.
📞 Phone: +61 2 9771 6400
📧 Email: customerservice@thermotec.com.au
🌐 Website: www.thermotec.com.au
Previous
Next
Contact us
If you require more information regarding our products or would like to place an order, connect with one of our sales team by completing the form. We will get back to you as soon as possible..
Alternatively you can call us for immediate assistance and one of our sales team will be happy to help you.